论坛风格切换
正版合作和侵权请联系 sd173@foxmail.com
 
  • 帖子
  • 日志
  • 用户
  • 版块
  • 群组
帖子
购买邀请后未收到邀请联系sdbeta@qq.com
  • 33520阅读
  • 40回复

[行业软件]SYNCHRO 4D Pro CONNECT Edition Update 5 (06.05.01.05) 全新授权 [复制链接]

上一主题 下一主题
离线pony8000
 

发帖
53390
今日发帖
最后登录
2024-11-14
只看楼主 倒序阅读 使用道具 楼主  发表于: 2021-01-19 08:00:06

SYNCHRO 4D Pro 2020   | 2.6 Gb
Languages: English, Русский, Português, Français, 한국어, Türkçe, 中文, Español, العربية, Polski,
Deutsch, Nederlands, Norsk, 日本語

Synchro Systems, a bussines Bentley Systems, is pleased to announce the availability of SYNCHRO 4D Pro CONNECT Edition Update 5 (06.05.01.05) is an advanced software tool to plan, schedule, and manage construction projects in a 4D environment.


SYNCHRO 4D Pro 2022 (6.5.1.5) release announcement

Improvements for Cloud-hosted 4D project through SYNCHRO Control
1. Improvements for cloud project where iModel connectors are the initial source of geometry:
a. Allow user to create or import 3D models or objects directly in 4D Pro even if iModel connectors are the initial source of geometry – empowering 4D Pro users to place equipment and add workspace directly, rather than having to go back to the source modeling program. Therefore, fulfilling the construction planning user journey.


b. More iModel properties are available in 4D Pro – implemented Process more iModel properties (in SYNCHRO Control, Administration> Manage iModel, click … on any iModel, choose Edit> SYNCHRO Sync Settings). While enabled, more iModel properties are available in 3D Properties> User Fields in 4D Pro (properties from iModel presentation rules become available)



c. Import Modeler Cost Codes from iModel as User Fields – allows iModel users to see the split objects, assigned cost codes and quantities from Modeler in 4D Pro.


2. Improvements for cloud project where SYNCHRO 4D Pro is the source of geometry (initial setup is from .sp)
a. Incremental sync to iModel – now only synchronize the changes made in 4D Pro to iModel rather than exporting everything every time. As a result, faster sync and less wait for changes made by 4D Pro users to be seen in SYNCHRO Control and Field.
b. Make user fields of all types available – implemented Process 3D User Fields and Process Non-3D User Fields options in Sync settings to export user fields of all types (in SYNCHRO Control, Administration> Manage iModel, click … on any iModel, choose Edit > SYNCHRO Sync Settings). Users using SYNCHRO Control, SYNCHRO Field and PowerBI connector can access such data for review and analytics (additional implementation in these products to surface the display of those properties is required).
3. One-click cloud project upgrade from 6.4 to 6.5 – allows users to upgrade project with one click and access to the upgraded version in a few minutes. It is no longer required to redeploy and reprocess the entire. sp file. Note that 6.3 cloud projects will need to be upgraded to 6.4 first then upgraded to 6.5.


4. Option to display userId next to transaction – allows 4D Pro user to understand who submitted transaction by displaying userId next to it in Windows > Transactions. User details can be checked here: https://construction.bentley.com/{projectId}/users/{userId}. [SYNCHRO 4D Pro, Options > SYNCHRO Control, check option Enable user ID column in transactions view.]


5. Reduce the number of requests for approval raised in browser when multiple SYNCHRO 4D Pro instances are running in parallel on the same machine using the same Bentley IMS credential.
6. Forms improvements
- Add support for Form controls: Weather, Photo Drop, Signature
- Forms is available when multiple Control projects are opened in multiple 4D Pro instances
- Create Forms from selected Tasks enhancements
- Move Forms settings to be under Options > SYNCHRO Control

Major Features

Planning and Scheduling

1. Allow user to create Baseline Types Codes and assign to Baseline – allow admin user to attribute schedule baselines with Baseline Type codes and compare Baselines of the same type. [Navigator > Codes to add or update Baseline Type Codes, and Navigator > Baselines and Scenarios > Type to assign code]
2. Import and synchronize from single P6 XML that contains more than one schedule project – Improves user experience when importing and synchronizing from P6 XML containing multiple schedules projects from Primavera P6 (typically such setup is required on projects with multiple contractors and sub-contractors). Reducing steps required to achieve the same workflow and saving user’s time. [File > Import > Primavera P6]. See also Working with Primavera P6>Importing Interlinked P6 Projects.
3. Support tracing logic when Task Filter is applied – adds selected Predecessors or Successors to Task list even when a Task Filter is applied so user can trace logic more easily.
4. Include newly added Tasks even when Task filter is applied - adds new Tasks to Task list even when a Task Filter is applied in view.
5. Group, Sort, Color, and indentation for Task/Resource Usage spreadsheet – allows user to customize the Task and Resource Usage spreadsheets with a cleaner and more organized presentation alike the look in Task list. [Windows ribbon > Usage panel > Task Usage Spreadsheet or Resource Usage Spreadsheet]

6. Update Summary row values and bars based on filtered rows (for custom groups) – summarizes values at parent Tasks for key parameters such as dates and durations in Custom Grouping or grouped by Activity Codes.

7. Always compute % Complete of all types – lets user reference % Complete of other Progress Types to better understand Task progress.
8. Make more EVA fields available – makes all EVA parameters available in Task table > Customize Columns. Some of them were only available in Task Properties > EVA tab previously.
9. Update Add/ Delete Links Dialog - adds Start and Finish columns for Target Task, and Customize Columns, and sort. [Task Properties > Links > right click to Add]
10. Allow importing custom Excel files with column mapping (Beta) – adds support to import custom Excel files with column mapping capabilities; previously importing from Excel required users to export the template, update and import/integrate the changes. This is a Beta feature that welcomes user’s feedback. [File > Import> Excel]

Auto-Matching and 3D

11. Select 3D by bounding box - is a new 3D selection tool that allows users to search and select 3D objects within specified search range along each axis. Smart select faraway 3D assists users in detecting 3D objects that are faraway and distant from most of the 3D objects. When a 3D object is selected prior to opening this tool, it tries to detect all 3D objects residing in the selected 3D.

12. Auto-Matching 3D Objects to Resources – is useful to “restore” loss of assignments between 3D and Resources as long as there is a match between 3D attribute values and Resource attribute value. With this improvement, Auto-Matching is possible for all main object assignments. [Assign Resources ribbon > Auto Matching > 3D Objects to Resources]


13. Allow user to save appearance profile in the auto-matching rule - lets user choose Appearance Profile when defining Auto-Matching rule. [Assign Resources ribbon > Auto Matching Resources to Tasks or Resource Group to Tasks, Edit rule dialog > Appearance Profile]


Animation, 3D Path, Viewpoints and Report

14. Output Project statistics – allows 4D Pro user to understand the volume and complexity of data and relationship inside the .sp file. Potential insights to understand changes in data before/ after some user action. [External Data > Project > Statistics]


15. Skip non-working time on animation playback – lets user specify a calendar so its non-working time can be skipped so user doesn’t need to waste time when reviewing the animation playback in 4D Pro or from the exported video. [4D Review ribbon > Animation, then go to General > Skip non-working time (by calendar) to choose a calendar]


16. Folder structure for Viewpoints – provides users a way to organize Viewpoints into folders.


17. Edit properties for multiple selected animation keyframes – can select multiple keyframes using CTRL or SHIFT key, then apply current Focus Time, Viewpoint, State, or use Selected Task as Anchor. [4D Review ribbon > Animation Editor > right click context menu].
18. Select 3D Path keyframe from 3D View – makes selection of 3D Path keyframes much easier.
19. Custom Alignment manipulator to edit Resource on 3D Path – adds an additional manipulator control to edit custom alignment when editing 3D Path. No need to hold down SHIFT key when editing custom alignment. [3D Path Properties > Show Custom Alignment Manipulator option].


20. Generate Timeline based on selected Task Start/Finish – adds options “Start of the selected Tasks” and “Finish of the selected Tasks” under Start time and Finish time. This is useful when keyframes need to be created based on a subset of the schedules. [Select some Tasks, right click in Animation Editor > Generate Timeline].


Integration and 3rd party library updates

21. Synchronization with ASTA based on Task IDs – adds option to perform Synchronize From/To based on Task IDs rather than UIDs from ASTA, and possibility to Synchronize Calendars by Name. [Navigator > External Data > Asta > Synchronise From]


22. Allow Consolidate for processing User Field values when synchronizing from IFC – prevents removal of User Field values that are assigned to Resources by 4D Pro when synchronizing from IFC. Consolidate is the default synchronization option used for processing user field values when synchronizing from IFC.[Navigator > External Data > IFC > Synchronise From]
23. Upgrade Safran integration.
24. 3D Interoperability updates
- ACIS: up to 2021
- AutoCAD: R14 - 2022
- Autodesk Inventor: up to 2022
- CATIA V5/V6: Up to V5-6-R2021
- Dassault Interchange Format: Up to V5-6 R2019 (R29)
- Navisworks: 2017-2022
- Parasolid: up to v33.1
- ProE/Creo: Pro/Engineer 19.0 to Creo 8.0
- Revit: 2017-2022
- Rhino: 4, 5, 6, 7
- SolidEdge: V19 - 20, ST - ST10, 2021
- SolidWorks: up to 2021
- UGS JT: up to 10.5
- Unigraphics NX: V11 to v18, NX to NX12, NX1847 Series to NX1980 Series
25. Upgrade ProjectWise integration.
26. Add cutting box support for Iray.

Minor Improvements
1. Show Code Value Description option is added in Codes window > Project.
2. Show Code Value Description option is added in Legend when Activity Code color mode is used.
3. Make editing lag time easier – improves user experience by setting focus in Lag field once it is clicked so it is ready for value input.
4. Option to not to carry grouping colors across the Gantt – declutters the Gantt view in product and prints.
5. Add “Week Day” in text to Gantt chart timeline ruler
6. Add Project year and quarter for Focus Time format – py# and pq# can be used in 3D View Properties > Indicators > Focus Time > Format
7. Allow transparent background for legend in 3D view and animation export
8. Remember 3D subdivision tool settings from previous use – improves user experience by keeping previous settings for Axis Indicator and Isometric View.
9. 3D Filter color no longer overwrites line/edge color – makes concrete splits more distinct and joints clearer when 3D Filter is on.
10. Add Resource Group markers on Gantt bars – adds a little square symbol on Gantt bars if there is any Resource Group assignment.
11. Add Viewpoints command to right-click context menu in 3D View when 3D objects are selected.
12. Add "Copy" or "Copy to text" in CM for selected User Fields in User Fields window – lets user to copy the selected User Field names and types to elsewhere.
13. Import images and image properties when importing animation from another .sp – lets user reuse images from the imported animation
14. Import Resource Group code and assignments when importing .sp – adds separate .sp import options.
15. Update links to Bentley Communities FAQ, Bentley LEARN and Resource Center
16. Update Help documentation.
17. Removed 3rd party x264vfw codec from installer.
Bugs squashed
- Invalid error message when attempting to capture selected task/resource/3d object to closed Form
- Error: CapturedTasks or 3D object, or Resource was not found in the ECClass "_ConstructionOffice" when trying to capture those for the selected Form
- Generated image for model location thumbnail "model-view…" should not be listed in the list of attachments
- Assigned User of the Form should be able make a transition regardless of their permissions
- Some objects in the scene disappear after switching render mode in Iray
- Zoom in/out (with use mouse wheel) not work in the scene after switching render mode in Iray
- Cost type issue for different resource types
- Select geometry by box dialog: cannot clear textbox and enter new value
- Code name and code value description do not refresh in Legend when changed
- Task color in Task Usage Window does not refresh until F5 is pressed
- Different colors for summary task with custom color in Gantt and Task Usage windows
- Crash when trying to assign a Raytrace material to an object
- Text is not displayed after creation or load/unload
- Multiple crashes on import IFC file and import failures
- Resource does not assign to task if remove appearance profile from rule
- Incorrect Resource attributes titles in 3D Objects-to-Resources Auto-Matching rules
- Limited user can know values even without permission to read with Calculated user field values for assigned objects
- Cannot change date by calendar in ISO format
- Only datasource existing in local network are displayed in ProjectWise login window
- Open/ import ProjectWise project is disabled
- Export changesets instead of Synchronise To when adding changes in 4D Pro
- Transaction size can display as negative
- Rollback does not work, transactions are rejected after rollback attempt
- iModel export fails because of "Unauthorized" exception



SYNCHRO is a complete portfolio of integrated software and services for digital construction management. Together, they enable construction firms to win projects, deliver them more efficiently, and get paid, improving the use of data to optimize decision-making, resourcing, and profitability.

Powerful 4D scheduling and task management capabilities help plan and optimize even complex construction projects across in civil, building, and industrial sectors. With access to the latest data in the field via apps or a web browser, teams at the jobsite can access the information they need, tailored to the context in which they need it. View and record the status of tasks, track and raise issues, sync to model, dashboard, and map views.

SYNCHRO Pro is the leading 4D construction modeling application delivered in SYNCHRO 4D, enabling model-based scheduling and simulations. Improve safety, quality and cost throughout the project lifecycle

Virtual construction isn’t about project simulations, SYNCHRO Pro gives teams a medium to create, analyze, edit, report and manage projects through a single visual interface. What enables teams to improve quality, safety, productivity, and efficiency of construction projects around the world.

SYNCHRO Pro creates an environment that interoperates with all major 3D modeling technology and scheduling applications in the market.

Deploying this environment, with a real-time transactional database and open application program interface (API) running on Microsoft Azure Cloud, opens the door for total participation from the construction supply chain.

SYNCHRO 4D BIM/VDC Construction Project Management







Bentley Systems is the leading global provider of software solutions to engineers, architects, geospatial professionals, constructors, and owner-operators for the design, construction, and operations of infrastructure, including public works, utilities, industrial plants, and digital cities. Bentley’s MicroStation-based open modeling applications, and its open simulation applications, accelerate design integration; its ProjectWise and SYNCHRO offerings accelerate project delivery; and its AssetWise offerings accelerate asset and network performance. Spanning infrastructure engineering, Bentley’s iTwin Services are fundamentally advancing BIM and GIS to 4D digital twins.

Bentley acquired 4D pioneer Synchro Systems in June 2018, and in October 2018 positioned the Synchro deal as a key step in expanding its construction-oriented toolset, and mentioned integration with Microsoft Hololens was part of the development roadmap.

Product: SYNCHRO 4D Pro
Version: CONNECT Edition Update 5
Supported Architectures: x64
Website Home Page : www.bentley.com
Languages Supported: multilanguage
System Requirements: Windows *
Size: 1.8 Gb


* System Requirements:


SYNCHRO Client System Requirements

In order to run the SYNCHRO client, the following Minimum, Recommend and Enterprise Edition system specifications are outlined below.

- The Minimum Specification accommodates a project with several thousand tasks, and some 3D information (such as the example models provided with SYNCHRO)
- The Recommended Specification accommodates a project with tens of thousands of tasks, and detailed 3D information.
- The Enterprise Specification ensure scalability and performance for the largest projects, and highly detailed 3D information (for example structure plus MEP detail)
此帖售价 29 电魂,已有 14 人购买 [记录] [购买]
购买后,将显示帖子中所有出售内容。
若发现会员采用欺骗的方法获取财富,请立刻举报,我们会对会员处以2-N倍的罚金,严重者封掉ID!
此段为出售的内容,购买后显示






软件下载咨询 sdbeta@qq.com
 
精品软件:百度搜闪电软件园  最新软件百度搜:闪电下载吧
有问题联系 sdbeta@qq.com

发帖
1648
今日发帖
最后登录
2024-11-11
只看该作者 沙发  发表于: 2021-01-19 08:55:45
谢谢楼主分享
离线zhuhongfeng

发帖
489
今日发帖
最后登录
2024-06-02
只看该作者 板凳  发表于: 2021-01-19 08:57:39
全英文纯顶!
离线mypwjclu

发帖
3815
今日发帖
最后登录
2024-11-13
只看该作者 地板  发表于: 2021-01-19 09:40:14
支持楼主!!!
离线guchangman

发帖
96
今日发帖
最后登录
2024-11-10
只看该作者 地下室  发表于: 2021-01-19 17:13:15
谢谢分享,good
离线ktv9779

发帖
29
今日发帖
最后登录
2021-12-27
只看该作者 5 发表于: 2021-01-19 18:38:37
全英文纯 顶!
软件下载咨询 sdbeta@qq.com
 
离线chary123

发帖
596
今日发帖
最后登录
2024-09-03
只看该作者 6 发表于: 2021-01-20 08:40:13
这是啥
离线ganjun2001

发帖
3506
今日发帖
最后登录
2024-11-10
只看该作者 7 发表于: 2021-01-20 09:06:07
      
离线guchangman

发帖
96
今日发帖
最后登录
2024-11-10
只看该作者 8 发表于: 2021-01-20 09:28:21
不错,学习一下
离线sxxxn

发帖
63
今日发帖
最后登录
2021-03-02
只看该作者 9 发表于: 2021-01-20 10:43:28
用户被禁言,该主题自动屏蔽!