论坛风格切换
 
  • 帖子
  • 日志
  • 用户
  • 版块
  • 群组
帖子
购买邀请后未收到邀请联系sdbeta@qq.com
  • 1417阅读
  • 2回复

[行业软件]JCT Consultancy quickGreen v2.0.3.0 [复制链接]

上一主题 下一主题
离线pony8000
 

发帖
53399
今日发帖
最后登录
2024-12-22
只看楼主 倒序阅读 使用道具 楼主  发表于: 2023-10-21 20:18:33

quickGreen is an innovative software tool to help signal engineers measure and calculate phase intergreens for traffic signal junctions. The software is designed not only to speed up the measurement process but also to reduce errors, improve the ease of checking of intergreens and assist with archiving intergreen calculations.


The quickGreen process for determining intergreens is as follows:

  • A drawing of the junction is imported into quickGreen from any of the usual sources including AutoCAD, a PDF, satellite imagery or even a scanned drawing.
  • After importing the drawing is calibrated to a known scale within quickGreen.
  • Lanes, Turning Movement Paths, and Pedestrian Crossings are added by overlaying them on the scaled drawing. Turning Movement Paths can be easily refined to fit any geometry using typically one or two control points on the path.
  • As the model is built up, quickGreen will automatically locate intergreen conflict points and measure distances between stop lines and conflict points, as required by the calculation method described above. This results in X distances for the critical conflict points.
  • Traffic signal Phases are added to group lanes controlled by the same Phase.
  • The critical X distances are used to calculate a Phase Intergreen Matrix using the lookup table in the UK Traffic Signs Manual, Chapter 6.
  • Calculated intergreens can be overridden and adjusted if necessary and notes can be added to explain why adjustments have been made.
  • The Intergreen Matrix can be exported to LinSig or other signal design software.
  • Traffic - Pedestrian and Pedestrian - Traffic Intergreens can also be calculated.
  • A detailed PDF report showing how the intergreens were calculated as well as the final Intergreen Matrix can be produced.
  • quickGreen can easily accommodate changes to Junction geometry. As lanes or turn paths are moved conflict distances and intergreens are instantly recalculated allowing the effects of changes to Junction geometry to be quickly evaluated.
此帖售价 89 电魂,已有 0 人购买 [记录] [购买]
购买后,将显示帖子中所有出售内容。
若发现会员采用欺骗的方法获取财富,请立刻举报,我们会对会员处以2-N倍的罚金,严重者封掉ID!
此段为出售的内容,购买后显示

软件下载咨询邮箱: sdbeta@qq.com (回复及时)
 
精品软件:百度搜闪电软件园  最新软件百度搜:闪电下载吧
有问题联系 sdbeta@qq.com
离线kairimai

发帖
1312
今日发帖
最后登录
2024-11-16
只看该作者 沙发  发表于: 2023-10-21 21:06:49
离线mypwjclu

发帖
3877
今日发帖
最后登录
2024-12-25
只看该作者 板凳  发表于: 2023-10-22 01:41:18
   谢谢楼主分享。